In order to ensure that the detector signals are sampled properly, the long-term stability of the LHC clock with respect to the bunch arrival times must be monitored with a precision of <100ps. In addition, it is important to monitor the LHC bunch structure and trigger conditions  by measuring the intensity of each bunch locally in the experiment.

A beam phase and ntensity acquisition board (BPIM) is being developed for the Button Electrode Beam Pickups which will be installed on both sides of the LHCb interaction point. The board measures the two quantities continuously per bunch crossing, and processes and histograms the information in an onboard FPGA. The information is read-out by the Experiment Control System and is directly fed to the LHCb Timing and Fast Control system.

    Documents

Presentations

  • LHC Clock Distribution and Monitoring Beam Phase and Intensity, R. Jacobsson, LHCb week Nov 2005 (presentation)