Presentations at LHCb meetings
- Results of OPC evaluation : P. Gras (Oct 98) [pdf]
- LHCb Controls: Progress and Status, LHCb week (15-June-1998) [pdf]
- LHCb Control Project: Progress and Status (13-May-1998) [pdf]
- Requirements for the DCS (3-Dec-1997) [ps,
pdf]
- Planning for Slow Controls (4-Dec-1996) [ ps, pdf]
Available Documents
- Presentation at the JCOP Workshop II (CERN), LHCb Controls (8-Sep-1999)[pdf]
- LHCb memorandum to the JCOP Steeting Group (12-Apr-1999) [pdf,
ps]
- Detector Control System for an LHC experiment: URD (23-Jan-1998) [ps, word, pdf]
- Presentation at the JCOP Workshop (CERN), Requirements for LHCb Controls
(4-June-1998) [pdf]
Activities
- Collecting LHCb specific requirements.
Questionnaire sent Dec 1997 to the sub-detector
contacts.
- OPC Evaluation
- Collecting LHCb specific requirements on Interfacing the Readout Electronics.
Questionnaire sent Nov 1999 to the sub-detector contacts.(HTML,
MSWord)
- Current project plan