The Online installation started in October 2004 with the
Ethernet installation in D1, D2 and D3. In 2005 most of the preparation for the
farm-installation in D1 was done, along with many other things. 2006 will be the
main year for the Online Installation, closely connected with the commissioning.
The most recent planning can be found here in M$Project and also as a pdf .
|
|